TM 11-6625-486-14& P
SERVICE UPON RECEIPT AND INSTALLATION
Section I. SERVICE UPON RECEIPT OF MATERIEL
2-2. Checking Unpacked Equipment
a. Packaging Data. When packed for shipment,
the components of Frequency Meter AN/USM-159(*) are
a. Inspect the equipment for damage incurred
placed in a carton and packed in a wooden box. A
during shipment. If the equipment has been damaged,
typical shipping box and its contents are shown in figure
2-1. The dimensions of
the box are 14 by 14 by 15
b. Check the equipment against the component
inches.
listing in the operator's manual and the packing slip to
see if the shipment is complete.
Report all
b. Removing Contents.
discrepancies in accordance with the instructions of TM
(1) Cut and fold back the metal straps.
38-750. The equipment should be placed in service
(2) Use a nailpuller to remove the nails from
even though a minor assembly or part that does not
the top and one side of the box. Remove the top and
affect proper functioning is missing.
one side. Do not pry them off; prying may damage the
c. Check to see whether the equipment has been
equipment.
modified. (Equipment which has been modified will
(3) Open the waterproof barrier which covers
have the MWO number on the front panel, near the
the carton inside the box. Remove the carton.
nomenclature plate.) Also check to see whether all
(4) Open the carton and the moisture-
currently applicable MWOs have been applied. (Current
vaporproof barrier within the carton. Remove the inner
MWOs applicable to the equipment are listed in DA
corrugated carton. Open the inner carton and remove
Pam 310-7.)
the contents.